The school was rebuilt by Stewart Construction.
The ramps are needed for people in wheel chairs, so they can have access to all areas of the school.
Stage two of the school rebuild is to build a lift and a bridge to give access to the upper rooms.
Ramps are made of concrete.
B block ramp 1
B block ramp 2
Building site 1
Building site 2
Staff Room ramp 1
Staff Room ramp 2
C block ramp 1
C block ramp 2
Student Support ramp 1
Student Support ramp 2
No comments:
Post a Comment